* Astronomy

Members Login
Username 
 
Password 
    Remember Me  
Post Info TOPIC: Minotaur


L

Posts: 131433
Date:
Streak Satellite
Permalink  
 


Latest TLE Data

STP-R1 (USA 185)
1 28871U 05037A 06177.73839447 .01811029 18801-5 16411-3 0 8357
2 28871 096.2967 358.1569 0011374 233.5536 126.4704 16.38862222 44391
1 28871U 05037A 06176.20958961 .01099846 18585-5 16414-3 0 8303
2 28871 096.2982 356.6411 0011446 228.0413 132.0054 16.34274348 44146
1 28871U 05037A 06175.78084080 .00979438 18533-5 16007-3 0 8299
2 28871 096.2972 356.2183 0012128 225.7783 134.2551 16.33351353 44078
1 28871U 05037A 06175.53573445 .00921134 18504-5 15737-3 0 8286
2 28871 096.2962 355.9753 0012970 227.6771 132.3429 16.32870797 44035
1 28871U 05037A 06175.22926020 .00849689 18491-5 15418-3 0 8277
2 28871 096.2981 355.6693 0012251 227.8059 132.2284 16.32294451 43987


__________________


L

Posts: 131433
Date:
STREAK
Permalink  
 


As an update the latest decay date is April 16th.
However, the classified mission is being kept in orbit until September 2006.
The satellite will have to be given several more orbit boosts to keep it alive.

The classified Streak STP-R1 (USA 185) experimental satellite is an Defence Advanced Research Projects Agency (DARPA) satellite to demonstrate technology for future low-earth-orbit satellites and gather information about conditions that could affect future low-earth-orbit spacecraft.
Streak is fitted with just two instruments; an ion gauge and an atomic oxygen sensor.

__________________


L

Posts: 131433
Date:
RE: Minotaur
Permalink  
 


Updated re-entry time is 03 April 2006 at 23:59 UTC ± 3 days...

__________________


L

Posts: 131433
Date:
Permalink  
 

The classified Streak STP-R1 (USA 185) experimental satellite launched aboard a Minotaur-1 rocket from the Vandenberg test range, SLC-8 on the 23rd September 2005, is expected to re-enter the Earths atmosphere on the 26th March, 2006.


Expand (102kb, 560 x 336)

The Streak STP-R1 (USA 185) was an Defence Advanced Research Projects Agency (DARPA) satellite to demonstrate technology for future low-earth-orbit satellites and gather information about conditions that could affect future low-earth-orbit spacecraft.
Streak is fitted with just two instruments; an ion gauge and an atomic oxygen sensor.

TLE Data:

STP-R1 (USA 185)
1 28871U 05037A 06079.85087699 .00415768 18060-5 25683-3 0 5078
2 28871 096.3306 263.6982 0006590 237.6196 122.4462 16.18012539 28596
1 28871U 05037A 06079.54161207 .00427666 18052-5 26909-3 0 5053
2 28871 096.3311 263.3974 0006603 237.7981 122.2670 16.17761593 28542
1 28871U 05037A 06079.54161207 .00406832 18049-5 25611-3 0 5061
2 28871 096.3307 263.3979 0006545 238.7074 121.3586 16.17756656 28541
1 28871U 05037A 06079.23230011 .00415382 18037-5 26666-3 0 5043
2 28871 096.3307 263.0970 0006236 239.6247 120.4435 16.17494112 28491
1 28871U 05037A 06078.86106654 .00374263 18020-5 24639-3 0 5037
2 28871 096.3300 262.7378 0006796 245.3737 114.6861 16.17141142 28435

__________________


L

Posts: 131433
Date:
Minotaur launch
Permalink  
 



Expand

source


__________________


L

Posts: 131433
Date:
Permalink  
 


Expand (43kb. 800 x 600)
The first stage vapour trail
Photo by Robert Gonsett


Expand (22kb, 800 x 600)
Corkscrew vapour trail as seen from San Diego.

__________________


L

Posts: 131433
Date:
Permalink  
 

The £12 million Minotaur was deployed into a sun-synchronous orbit.


Credit: Gene Blevins LA Daily News

__________________


L

Posts: 131433
Date:
Minotaur Launched
Permalink  
 


The Minotaur rocket carrying a DARPA payload launched at 02:24 GMT from Vandenberg Air Force Base, Arizona, US.
After blastoff, the rocket was tracked over the Pacific.
DARPA is the research and development arm of the Pentagon. The 417 kilogram "Streak" payload will stay in orbit for a year, gathering information about the `Earth's environment` in low orbit. according to Maj. Todd Fleming.
The mission's cost is classified.
The military research satellite payload was so named because of the streaking movement it makes across the sky.

__________________


L

Posts: 131433
Date:
RE: Minotaur
Permalink  
 


The spacecraft was deployed into orbit.

Confirmation came 2 hours after launch.


__________________


L

Posts: 131433
Date:
Permalink  
 

T plus 19 minutes

Still waiting for confirmation of spacecraft separation.


__________________
1 2 3 4  >  Last»  | Page of 4  sorted by
 
Quick Reply

Please log in to post quick replies.



Create your own FREE Forum
Report Abuse
Powered by ActiveBoard